Excavation and installation works of the main pipeline of the hydroelectric power plant, along with all concrete and reinforcement works.
Construction of a micro hydropower plant put into operation. Work has been done to expand the existing tunnel, as well as to mine it.
All the work was done in extremely inaccessible terrain with the great help of the local community and Vegoris Ecotech d.o.o. company from Podgorica.
Project value: 520.000€