At “Long Beach Hotel” we carried out a reconstruction of the hotel’s reception area, along with its toilets, corridors, lobby bar, and the hotel’s restaurant halls. The existing inventory was dismantled from all parts of the hotel.
The new plumbing system was completed, as well as electrical installations. New thermomechanical units were installed. The entrance hall was adapted to the hotel pool.
New floors, wall coverings, suspended ceilings, ceramics were made, as well as a completely new reception, lobby, and restaurant interior.
Project value: 540.000€